Lendvai Kft.
Tel.: 06-96/518-433
Fax: 06-96/425-778
E-mail: info [k] lendvaikft.hu

References

Implementation

CURRENT PROJECTS

  • Austrotherm office building, Győr - heat recovery ventilation
  • Katharinenhospital, Stuttgart - ventilation system and pipeline installation
  • Grötsch Energietechnik GmbH Kreiskliniken Altötting-Burghausen - heating and cooling system installation
  • Bürogebäude Allesco GmbH, Esslingen - heating and cooling system installation

2019

  • Katharinenhospital , Stuttgart - ventilation system and pipeline installation
  • Grötsch Energietechnik GmbH, Kreiskliniken Altötting-Burghausen - heating and cooling system installation
  • BMW Werk, Dingolfing - ventilation system installation
  • Austrotherm Kft., Győr - HVAC works

2018

  • Meyer Werft, Papenburg - air-conditioning, ventilation and pipeline system installation on NCL cruise ships under construction
  • BMW Werk, Dingolfing - ventilation system installation
  • Heltech, Frankfurt toronyház - ventilation system installation
  • Katharinenhospital, Stuttgart - ventilation system installation
  • Austrotherm Kft., Szekszárd - cooling system modification of the factory
  • 2017

    • Junkerwerk Linder GmbH. & Co KG Hungarian branch - HVAC works and technological pipeline installation
    • Austrotherm Kft., Győr - HVAC works and technological pipeline installation

    2016

    • BACON GEBÄUDETECHNIK GmbH & Co KG – München
    • K8 Bürogebäude Microsoft, MK 2 Hotel Leonardo
    • AERIUS Marine GmbH (IMTECH MARINE Schiffbau-/Dockbautechnik Gmbh)
    • Blohm + Voss Shipyards GmbH Hamburg - air-conditioning, ventilation and pipeline system installation on warships under construction
    • MAC Hamburg GmbH,Papenburg - air-conditioning, ventilation and pipeline system installation on NCL cruise ships under construction
    • Austrotherm Kft., Győr - technological pipeline installation
    • UFM Egyesült Habanyaggyártó Bt., Mosonmagyaróvár - technological pipeline installation

    2015

    • IMTECH MARINE Schiffbau-/Dockbautechnik Gmbh.
    • Meyer Werft Papenburg - air-conditioning, ventilation and pipeline system installation on NCL cruise ships under construction
    • Blohm & Voss Naval GmbH Hamburg - air-conditioning, ventilation and pipeline system installation on F/125 ships under construction
    • GETEC Energie und Gebäudetechnik GmbH., Brunn am Gebirge – heating, cooling and ventilation system installation of newly built apartments
    • UFM Egyesült Habanyaggyártó Bt. -  steam, cooling water, gas, compressed air and thermal oil supply system installation

    2014

    • IMTECH Marine Schiffbau-Dockbautechnik GmbH Papenburg és Hambug:
    • Meyer Werft Papenburg - air-conditioning, ventilation and pipeline system installation on cruise ships under construction
    • Lürssen Werft Bréma - air-conditioning, ventilation and pipeline system installation on cruise ships under construction
    • Blohm + Voss Hamburg - air-conditioning, ventilation and pipeline system installation on cruise ships under construction
    • COFELY GEBÄUDETECHNIK GmbH
    • ÖBB Konzernzentrale Vienna - heating, cooling and ventilation system installation

    Previous works:

    • CIB Bank, Győr – HVAC, ventilation
    • Lotus Therme Hotel & Spa, Hévíz
    • Austrotherm Kft. Gyöngyös - technological pipeline installation of the factory
    • Austrotherm Kft. Győr - HVAC and technological pipeline installation of the factory
    • HARIBO Üzemcsarnok, Nemesvár - ventilation system installation
    • TEN CATE ENBI, Rétság - ventilation system installation
    • CAMPONA cinema and tropicarium, Budapest - ventilation system installation
    • PHILIPS factory buildings, Győr - ventilation system installation
    • Austrotherm Kft. Szekszárd - technological pipeline and gas boiler installation
    • UFM Bt. factory and office building, Mosonmagyaróvár - technological pipeline installation
    • Junkerwerk Linder GmbH & Co KG. factory and office building, Mosonmagyaróvár - technological pipeline installation
    • Dr. Oetker factory, Jánossomorja - cooling and ventilation system installation
    • BMW factory Oxford, England - ventilation system and technological pipeline installation
    • AUDI factory, Ingolstadt - technological pipeline installation
    • NOKIA factory, Komárom - ventilation system installation
    • Office bulding, Bratislava - ventilation system installation
    • PEZ Hungária Kft. Mosonmagyaróvár - ventilation system and technological pipeline installation
    • EUROVEA office building, Bratislava - water supply, sewage system installation
    • BACON GEBÄUDETECHNIK GmbH & Co KG: Salzburg shopping center, Wacker Neuson Linz - ventilation system installation
    • COFELY GEBÄUDETECHNIK GmbH: WU Vienna - heating and cooling system installation;Concrete factory, Zurndorf - heating, ventilation, compressed air and MSR
    • GETEC ENERGIE- & GEBÄUDETECHNIK GmbH, Vienna Star 22 office building - ventilation system installation

    Design

    • HVAC design of a 4 storey apartment house with 19 apartments + villa building – 55 József Attila St., Balatonalmádi
    • HVAC design of a detached house – Búzavirág St., Győrzámoly
    • Ventilation design of Austrotherm Kft. office building – 75 Fehérvári St., Győr.
    • HVAC design of a detached house – Radnóti Miklós St., Bábolna.
    • Heating and gas supply design of a guesthouse – 6 Szabadság St., Szany.
    • Gas supply design of an apartment – Bartók Béla St., Győr
    • Gas supply design of a detached house – Csalogány St., Győr
    • HVAC design of a detached house (heating and cooling with air to water heat pump) – Duna St., Győrújfalu
    • HVAC design of a 3 storey mixed-use building (13 apartments + 2 shops + 2 offices) – 72-74 Bercsényi liget, Győr
    • HVAC design of a detached house (heating and cooling with air to water heat pump) –Kölcsey Ferenc St., Győrújfalu
    • HVAC design of a 4 storey mixed-use building (16 apartments + 1 office) – Dózsa György St., Zalaegerszeg 
    • Heating and gas supply design of a detached house – Petőfi Sándor St., Écs
    • HVAC design of a 3 storey apartment house with 17 apartments – 52 Erzsébet királyné St., Csorna
    • Heating design of Innovatív Raktárlogisztika Kft. warehouse with radiant tube heater – 17 Almafa St., Győr
    • Ventilation design of a seeded operating-room (child accident and emergency medical care) – PAMOK hospital, Győr (contribution with M.A.T. – Protect Kft.)
    • HVAC design of a 4 storey apartment house – 8/A Bercsényi liget, Győr
    • HVAC design of a luxury penthouse – 6 Mogyorós St., Écs
    • HVAC design of a two-apartment detached house – Királyhágó St., Győr-Szabadhegy
    • HVAC design of a detached house – 31 Rózsafa St., Berhida
    • HVAC design of a 2 storey mixed-use building (21 apartments + 2 offices) – 27/C Kossuth Lajos St., Fertőszentmiklós
    • HVAC design of a 4 storey mixed-use building (7 apartments + 1 office) – 28 Szövetség St., Győr
    • HVAC design of a detached house – Hegyalja St., Écs